valves, taps and cocks: South Africa tenders, rfq bids, opportunities and procurement 2025


Total: 382
20 mar
Quotations are hereby invited for the Supply and Delivery of Inventory Items for Civil Department. Specifications: - Toilet Seats, N.I.P SABS APP, Hardened PLA x 30 units; - Cocks, Bib, Brass, C/W Hose Conn, 15mm Cobra x 100 units; - Cocks, Bib, Brass, C/W Hose Conn, 20mm Cobra x 100 units; - Mixer, Tap for Basin, 15mm x 100 units; - Bolts Rawl 6 x 55 mm x 100 units; - Bolts Rawl 8 x 50 mm x 100 units; - Bolts & Nuts, Hex, Black 8 x 25 mm x 200 units; - Bolts & Nuts, Hex, Black 12 x 55 mm x 200 units; - Hinges Butt, Steel, 75 mm x 30 units; - Nipples, Barrel, Galv 32 mm x 100 units; - Sockets, Galv, 10 mm x 100 units; - Bushes, Reducing, Black, 15 mm x 8 mm x 100 units; - Bushes, Reducing, Black, 20 mm x 15 mm x 100 units; - Bushes, Reducing, Galv, 15 mm x 8 mm x 100 units; - Bushes, Reducing, Galv, 25 mm x 20 mm x 100 units; - Bushes, Reducing, Black, 50 mm x 40 mm x 100 units; - Sockets, Reducing, Galv 1 1/2" - 1 1/4" x 100 units; - Elbows, Galv, F & F 90 Deg 50 mm x 10 units; - Bends, Galv, 80 mm x 90 Deg x 10 units; - Nipples, Barrel, Galv 25 mm x 100 units; - Plugs, Galv, 10 mm x 100 units; - Files, Round, 2nd Cut 250 mm x 10 units; - Sockets, Black, 40 mm x 100 units; - Sockets, Galv, 32 mm x 100 units; - Nipples, Barrel, Galv, 20 mm x 100 units; - Cistern Comp. Beta Bottom Inlet (FP 15F) x 30 units; - Wall Plate, Tee Cobra Fem Iron/Cop/Cop 15 x 20 units; - Valves, Cobra Closely 400 KPA x 50 units; - Hammer Head 4 lb (91.8 kg) x 10 units; - HSS Drill Bit, Straight, Shank – 4mm x 20 units; - Nails, Ramset Easy Drive ED 655 100/Box x 20 boxes; - Elbow, Galv, 90 Deg, 32 mm x 10 units; - Tee, Equal Conex Cobra, 611M B/BRS 22mm x 100 units; - Sockets, Reducing Galv 1 1/2" - 1 1/4" x 100 units; - Valve, Gate, Fullway CxC, 22mm x 10 units; - Handles, Hammer, 14 lb, 900 mm x 10 units; - Elbow, Galv, Female, 40 mm x 50 units; - Elbows, Galv, 10 mm - 100 units; - Bushes, Reducing, Galv, 15 mm x 10 mm x 100 units. Please confirm the closing time as two were published. (EN) add to Favorites
Customer: ONLINE TENDERS

Number: 120800901

Country: South Africa

Source: ONLINE TENDERS

18 mar
Toyota 5L Engine Valves (EN) add to Favorites
Deadline: 71 days
Customer: Made-in-china

Number: 120665191

Country: South Africa

Source: Made-in-china

06 mar
Quotations are hereby invited for the Supply of Safety related equipment: 3 each x mass decontamination system. Specifications: Mass decontamination shower unit that allows for rapid response in a hazardous material decontamination scenario. To include the complete inflatable shower structure system with removable internal partitioning and raised floor, that provides for splash containment and personal privacy. To limit weight and promote transport and compact storage, the unit must not include a mechanical framework. Features to include: Compact and easily transportable; Lightweight and quick set-up to facilitate rapid operational readiness and to remain standing without continuous inflation; Unit must be suitable for use on hard or soft standing with minimum four affixed guy ropes provided, for securing in position during inclement weather; Entrance and exit zippered roll-up doors with a separate curtain fitted to promote privacy; Flexible internal partitioning with pre and post decontamination changing areas; Internal layout to be partitioned into three lanes for male, female & assisted casualties, with pre and post decon changing areas; Partitions must be removable and doors able to be linked together allowing the shower to be configured as a single, double or triple lane system; To be fitted with windows on internal shower doors with covers and the assisted (central) lane door must include a zipped flap for transferring medical equipment; To include raised floor panels in shower that prevent contact with contaminated shower wash-off; Wash off must be collected in a chemically resistant sump; Integral detachable groundsheet; Sleeves for portable air heaters and pumped extraction of contaminated water to be incorporated into the design. Sleeves must be included; Shower nozzles must all be of demand type and can be turned on/off individually; Output flow of shower heads must be no more than 20 litres per minute each; Shower system to have two separate water feeds allowing introduction of water treated with a cleanser or neutralising agent; Four internal and four external shut-off taps to be fitted for individual control of front and rear, left and right-hand side water supply; Fitted with at least two internal spring loaded inflation/deflation ports that allow the use of ARS (automatic refilling system) inflators for extended deployments. Ports fitted with dust/water cap and the filling hose and connection to be included; Working pressure approximately 0.5 bar; Unit to be manufactured of PU material of minimum 900g/m²; Lightweight and easily portable in PVC cover/s fitted with handles and closures, to be included; Inflated height of unit not to exceed 2200mm; Unit weight not to exceed 100kg; Colour: predominant yellow upper with black or grey basin and ground sheet; System design allows for minimal training, servicing and maintenance costs. To be supplied with: Valise; Repair kit; Inflation hose - 1m (for use with 8 bar regulator); Accessories kit bag, containing galvanised ground fixing pegs, rubber mallet and hand pump, Non-slip self-draining matting, Electric inflator. Delivery Date: 2025/05/30. (EN) add to Favorites
Customer: ONLINE TENDERS

Number: 120059751

Country: South Africa

Source: ONLINE TENDERS

21 feb
Quotations are hereby invited to supply, install & commissioning complete piston compressors with vessels x 01/04 off. Specifications: - Ingersoll Rand - Model: 7100 (B60). Size 5.5 inches and 3 x 4 inches. EX Serial no: 9830040. Type 30 two-stage bare pump air compressor includes a two-stage 100% cast iron pump and the air filter canister. Flow: (1302 l/min). Working Pressure: 12 Bar. No Cylinders: 2 Cylinder. Stages: 2 Stage. Litres per minute: 1302 L/min or above. Minimum RPM: 750. Maximum RPM: 1500. Dimensions: 30L x 27W x 26H. Vessel Capacity: 500L (Should be supplied with vibration Dampener System to Reduce Vibration). Motor Voltage: 380V 3 phase. Drive Power: 11kW (15hp), belt driven with safety guards. The compressors should be compatible to Scada systems; - Auxiliaries (To be supplied with compressors) • Pressure switch with electrical contacts x 4; • Mechanical Pressure gauge x 4; • Pressure relieve valves x 4; • Copper pipes and fittings (for 4 compressors); • Motor (3phase 400V) 1500rev/min; • Vibration dampers/pads x 16; - Type 30 Air Compressor Blocks, Air power. Required documents upon delivery: Guarantee certificate: The contractor/service provider shall give a guarantee for a period of 12 months minimum after successful delivering the Compressors free from any defects in design. The contractor shall agree to replace at his/her cost any defective items discovered within the guaranteed period. Compressors should be accompanied by operating and maintenance manual. Please confirm the quantity required. (EN) add to Favorites
Customer: ONLINE TENDERS

Number: 119289129

Country: South Africa

Source: ONLINE TENDERS

11 feb

Number: 118767832

Country: South Africa

Source: RFQ

04 feb
Quotations are hereby invited for the repair and maintenance of the wastewater treatment plant in Loeriesfontein. Scope of Work: Inlet screen: • Not applicable; Electrical Supply System: • Check that all electrical cables & connections are intact and free of damage; • Check that Distribution Board/Control Panel Switches, Indicator Lights, Controls, Circuit Breakers, Contactors and overload protections are operational and test functionality where applicable; • Clean control panel and trunking and remove dust build up and any other materials Air Supply System; • Check all blowers for damage/wear or lubrication requirement; • Cleaning of Air Filter as required and replace quarterly; • Check all valves, relief valves, pressure gauges and piping for wear/damage and repair/replace as required; • Visually inspect bioreactor tanks to verify air supply to bioreactors; Re-Activated Sludge Return: • Check functioning of all valves; • Check if sludge return is functioning properly from all clarifier tanks; • Remove sludge return pumps visually inspect and check for any obstructions in the impellers; • Check sludge levels in all tanks and de-sludge if required; • Check dosing pump operation and settings and replace bacteria if required; Disinfection System: • Check operation of Ozone generators; • Measure air flow and maintain all pumps, Valves and components as per OEM Guideline; General/Process Operation: • Record whether the Plant been regularly maintained with respect to general cleanliness and preventative maintenance; • Are there any floating materials in any of the tanks; • What is the colour of the mixed liquor; • Is there a bad smell around the Sewage Treatment System; • Is there any floating sludge in the settler tanks; • Re-Train the relevant personnel during the service of the Plant; • Issue a report on the findings during the service on the Plant along with analysis results; Exclusions: • Any repairs on equipment; • Electrical component repairs; • Piping and Fittings repair. (EN) add to Favorites
Customer: ONLINE TENDERS

Number: 118405312

Country: South Africa

Source: ONLINE TENDERS