Pumps: South Africa tenders, rfq bids, opportunities and procurement 2025


Total: 540
29 nov
Quotations are hereby invited for roof maintenance at Vereeniging Pumping Station. Scope of work: 1) Lime plant canteen: - Roof is leaking on the sides of the entire building of the canteen; - The supplier should remove entire roof sheeting of the building; - Supply and install new long timbers sufficient length to cover the entire side of the building; - Replace the roof sheeting, under eaves and soffits; - Replace all damaged ceiling boards; - Clean all gutters and unblock down pipes; - Replace or repair all under eaves, soffits and fascia boards; - The total roof measurements: 25 meters x 17 meters. 2) Engine room 4: - The suspended ceiling inside engine room 4 is very dirty with spider webs; - Clean the entire suspended ceiling; - Repair leaking roof and replace damaged ceiling in HP pumps; - The total measurements for HP pump: 10 m x 8 m; - Repair leaking roof and damaged ceiling boards at LP side; - The roof is too high +- 30 meters. 3) WP1 Shiftiest: - The roof is leaking at the shiftiest, seal all leaking roof sheeting; - Replace where necessary; - Replace damaged ceiling boards and paint with PVA; - Paint the entire roof to match existing colours; - Clean all gutters and unblock down pipes; - Replace or repair all under eaves, soffits and fascia boards; - The total roof measurements: 25 meters x 39 meters. 4) Rec club: - Roof is leaking inside of the Rec Club and Ladies Bar; - Remove the whole roof sheeting and timbers; - Supply and install new timbers and roof tiles. Rec Club (Measurements: 3 m x 20 m); - Repair collapsing suspended ceiling at the entrance of the Rec Club; - The measurements for Ladies Bar: 26 m x 17 m; - Repair the leaking roof at the veranda, the Bowling side; - Supply and install new roof sheeting; - Supply and install new wooden ceiling to match the existing ceiling; - The total measurements for bowling side: 4 m x 20 m; - Clean all gutters and unblock down pipes; - Replace or repair all under eaves, soffits and fascia boards. 5) Electrical workshop: - The entire roof is leaking at electrical workshop; - Replace and repair all roof sheeting; - Supply and install all damaged gutters and down pipes; - Replace all damaged ceiling and paint with PVA - Paint the entire roof to match the existing colour; - Replace or repair all under eaves, soffits and fascia boards; - The total measurement for the workshop: 45 m x 40 m. (EN) add to Favorites
Customer: ONLINE TENDERS

Number: 115081332

Country: South Africa

Source: ONLINE TENDERS

20 nov

Number: 114436569

Country: South Africa

Source: RFQ

13 nov

Number: 113999590

Country: South Africa

Source: RFQ

02 nov

Number: 113402422

Country: South Africa

Source: RFQ

02 nov

Number: 113405471

Country: South Africa

Source: RFQ