Prefabricated buildings: South Africa tenders, rfq bids, opportunities and procurement 2024


Total: 59
12 nov
Re-Advertisement: Written price quotation are hereby invited from prospective suppliers for the supply, service, refill, replace, and delivery of all damaged fire extinguishers to all Municipality in Standerton. Specifications: Municipal Stores / Magasyn; 1. 2 x 9kg portable fire extinguishers; 2. 2 x Amerex (foam) fire extinguishers. Workshop: 1. 8 x 9kg portable fire extinguisher. Azalea Hall: 1. 4 x 9kg portable fire extinguishers. Stanwest Hall: 1. 5 x 9kg portable fire extinguishers. Stanwest Library: 1. 2 x 4.5 portable fire extinguishers. Sakhile Municipal Offices: 1. 6 x 9kg portable fire extinguishers. Sakhile Community Hall: 1. 8 x 9kg portable fire extinguishers. Sakhile Youth Centre: 1. 6 x 9 portable fire extinguishers. Sewer Plant: 1. 1 x 2.5kg DCP; 2. 1 x 9kg DCP. Sakhile Library: 1. 8 x 9kg portable fire extinguishers; 2. 2 x Fire hose reel; 3. 1 x Fire hydrant. Municipal Main Office: 1. 3 x Fire hose reel; 2. 5 x 4.5 ceiling mounted DCP (Records and Finance); 3. 8 x 9kg portable fire extinguishers; 4. 3 x 2.5kg portable fire extinguishers. Old Volkas Building: 1. 6 x 9kg portable fire extinguishers. Standerton Library: 1. 3 x 2kg Co2 portable fire extinguishers. Town Hall: 1. 5x 9kg portable fire extinguishers; 2. 1 x Fire hose reel. Standerton Fire Station: 1. 5 x 2.5 portable fire extinguishers; 2. 8 x 4.5 portable fire extinguishers; 3. 1 x 1.5 portable fire extinguishers; 4. 22 x 9kg fire extinguishers; 5. 30 x 9kg empty (power refill); 6. 5 x 5kg Co2 portable fire extinguishers; 7. 4 x 2kg Co2 portable fire extinguishers; 8. 1 x 4.5 ceiling mounted DCP (in a safe); 9. 4 x 50kg DCP trollies extinguishers; 10.4 x 2.25kg new DCP fire extinguishers; 11.2 x 9kg new class K fire extinguishers; 12.10 x Lithium fire extinguishers; 13. 2 x Fire blankets medium size; 14. 10 x New portable fire alarms complete with steel holder with breakable glass. Traffic Department: 1. 1 x 2kg Co2 portable fire extinguishers; 2. 2 x 4.5kg DCP portable fire extinguishers; 3. 3 x 9kg DCP portable fire extinguishers. Electrical Department: 1. 20 x 9kg DCP fire extinguishers; 2. 6 x 5kg Co2. Water Purification Works: 1. 2 x 2.5kg DCP; 2. 1 x 9kg DCP. Thusong Center: 1. 4 x 4.5kg DCP portable fire extinguishers; 2. 1 x 9kg DCP portable fire extinguishers; 3. 1 x 30m fire hose with nozzle 30 meter long. (EN) add to Favorites
Customer: ONLINE TENDERS

Number: 113919859

Country: South Africa

Source: ONLINE TENDERS

24 oct
Written price quotation are hereby invited from prospective suppliers for the supply, service, refill, replace, and delivery of all damaged fire extinguishers to all Municipality in Standerton. Specifications: Municipal Stores / Magasyn; 1. 2 x 9kg portable fire extinguishers; 2. 2 x Amerex (foam) fire extinguishers. Workshop: 1. 8 x 9kg portable fire extinguisher. Azalea Hall: 1. 4 x 9kg portable fire extinguishers. Stanwest Hall: 1. 5 x 9kg portable fire extinguishers. Stanwest Library: 1. 2 x 4.5 portable fire extinguishers. Sakhile Municipal Offices: 1. 6 x 9kg portable fire extinguishers. Sakhile Community Hall: 1. 8 x 9kg portable fire extinguishers. Sakhile Youth Centre: 1. 6 x 9 portable fire extinguishers. Sewer Plant: 1. 1 x 2.5kg DCP; 2. 1 x 9kg DCP. Sakhile Library: 1. 8 x 9kg portable fire extinguishers; 2. 2 x Fire hose reel; 3. 1 x Fire hydrant. Municipal Main Office: 1. 3 x Fire hose reel; 2. 5 x 4.5 ceiling mounted DCP (Records and Finance); 3. 8 x 9kg portable fire extinguishers; 4. 3 x 2.5kg portable fire extinguishers. Old Volkas Building: 1. 6 x 9kg portable fire extinguishers. Standerton Library: 1. 3 x 2kg Co2 portable fire extinguishers. Town Hall: 1. 5x 9kg portable fire extinguishers; 2. 1 x Fire hose reel. Standerton Fire Station: 1. 5 x 2.5 portable fire extinguishers; 2. 8 x 4.5 portable fire extinguishers; 3. 1 x 1.5 portable fire extinguishers; 4. 22 x 9kg fire extinguishers; 5. 30 x 9kg empty (power refill); 6. 5 x 5kg Co2 portable fire extinguishers; 7. 4 x 2kg Co2 portable fire extinguishers; 8. 1 x 4.5 ceiling mounted DCP (in a safe); 9. 4 x 50kg DCP trollies extinguishers; 10.4 x 2.25kg new DCP fire extinguishers; 11.2 x 9kg new class K fire extinguishers; 12.10 x Lithium fire extinguishers; 13. 2 x Fire blankets medium size; 14. 10 x New portable fire alarms complete with steel holder with breakable glass. Traffic Department: 1. 1 x 2kg Co2 portable fire extinguishers; 2. 2 x 4.5kg DCP portable fire extinguishers; 3. 3 x 9kg DCP portable fire extinguishers. Electrical Department: 1. 20 x 9kg DCP fire extinguishers; 2. 6 x 5kg Co2. Water Purification Works: 1. 2 x 2.5kg DCP; 2. 1 x 9kg DCP. Thusong Center: 1. 4 x 4.5kg DCP portable fire extinguishers; 2. 1 x 9kg DCP portable fire extinguishers; 3. 1 x 30m fire hose with nozzle 30 meter long. (EN) add to Favorites
Customer: ONLINE TENDERS

Number: 112841417

Country: South Africa

Source: ONLINE TENDERS

22 sep

Number: 111173478

Country: South Africa

Source: RFQ

12 aug
Re-Advertisement: Information are hereby requested for the following: Provision of New Prefabricated Smart Building System that utilizes Hybrid Glass-Fiber Reinforced Thermoplastic Composite Panels or similar material. Based on new requirements to identify viable existing products, specifically composite panel prefab smart building systems, the UN Office of Supply Chain Management seeks solutions that are rapid deployable, have a long lifespan, and improve power demand management. This comprehensive questionnaire is designed to gather detailed information from manufacturers and suppliers regarding the suitability and availability of customizable structures that utilize Hybrid Glass-Fiber Reinforced Thermoplastic Composite panels for UN military operations or similar material. The focus is on sustainability, modular building systems, customization, durability, aesthetics, security, and environmental considerations. Your input will be invaluable in assessing market capabilities and aligning them with the United Nations operational needs for durable, energy-efficient structures suitable for deployment in various global environments. The qualifications of interest for this product are the following: 1. Rapid Deployment: The product is designed for quick erection and commissioning with minimal use of heavy engineering equipment and specialized trades; 2. Modular System: It drastically reduces construction time and labour costs, shipping flat in ISO Standard 20 ft. Sea Containers for efficient logistics; 3. Customization: Features customizable options for size, rigidity, texture, colour, and inserts, adaptable to specific needs, utility, and environmental conditions; 4. Energy Efficiency: Enhances power demand management and provides superior R-value thermal performance, optimized acoustics, and resistance to energy loss; 5. Environmental Considerations: Sustainable, eco-friendly, 100% recyclable, and significantly reduces greenhouse gas emissions and carbon footprint. It is non-toxic and resistant to moulds, bacteria, and chemical corrosion; 6. Durability and Maintenance: Designed for a long lifespan of up to twenty years with minimal preventative maintenance, resistant to moisture, air infiltration, and pests like termites and rodents; 7. Compliance and Certifications: Meets international standards for military use and adheres to regulatory codes and environmental certifications. Country: Global. Please confirm the closing time as it was not published. (EN) add to Favorites
Customer: ONLINE TENDERS

Number: 109017249

Country: South Africa

Source: ONLINE TENDERS

11 aug
An invitation is hereby extended to potential service providers/suppliers to register on the VUT Supplier Database. The invitation is extended to all suppliers, however, the suppliers and service providers of the commodities listed are encouraged to register as these commodities are considered high priority items: • Property Valuers, • Media Communications, • Transportation, i.e. Hiring of Minibuses and Buses, • Student Election Services, • Travel Agents, • Accredited Professional Training Services, • Printing: Certificates, • Gas Supply, • Chemical and Laboratory supplies, • Specialised and Licensed Waste Management, • Specialised Steel supply, • Solar Equipment, • Research Analyst and/or Facilitators, • Legal Services: Labour Law; Commercial Law; Contract Law, Property Law, Litigation Intellectual Property; Procurement law; & Governance, • Finance: ie. Credit Assessors and Debt Collectors, • Built Environment Industry Consultants [Architects, Engineers (all disciplines), Project Managers, Quantity Surveyors, Landscape Architects, Construction Health and Safety Agents, Town & Regional Planners, Land Surveyors & Environmental Consultants], • Specialised Visual Arts Supply, • Electrical consultants, • Industrial, manufacturing and engineering equipment, components and services supply, • Medical supply, • Conference Venues, • Leather supply, • 3D Printers and 3D Printing Material supply and maintenance, • CNC & Laser cutting machines supply and maintenance, • Machinery components, • Computer hardware, software & accessories supply, • Electronic components Supply, • Automotive spare parts supply, • Carpentry supply, • Furniture supply, • Foam supply, • Occupation health and safety equipment and services supply, • Vinyl, Perspex, Plastic & Glass supply, • Linen and Fabric Supply, • Printing of Labels, • Suppliers of Clothing and promotional gift items, • Signage, marketing material (banners, exhibition stands, bowheads, etc.), • Upholstery of furniture, • Store Displays (Mannequins, stands, racks, hangers, stock containers), • Electronic Billboard Management, • Digital Advertising Displays, • Gas Installation and Maintenance Contractors, • Borehole Drilling Contractors, • Portable Water Storage Providers, • Energy Management Specialists, • Solar PV Suppliers and Installation Providers including inverters, • Green Building Certification/Inspection Service Providers. • Centralized Heating and Cooling Systems Providers & Maintenance, • Smart Building Metering Suppliers (Water Electricity), • Building Management Systems (BMS) providers, • Facilities Management Systems (FMS) Providers, • Asbestos inspection Authority (AIA) Consultants, • Lifts Inspection Authority consultants, • Roof waterproofing Specialists, • Vending Machine supply, • Catering services, • Medical diagnostics and research lab equipment, • Medical diagnostics and research lab reagents, • Licensed Human and animal cell supply, • Licensed microbiology organism, • Cell and tissue culture reagents, • Store Management Software, • Medical/Nursing equipment supply & maintenance, • Lifts inspection maintenance and supply. Please confirm the closing time as it was not published. (EN) add to Favorites
Customer: ONLINE TENDERS

Number: 108974162

Country: South Africa

Source: ONLINE TENDERS

06 aug
Re-Advertisement: Information are hereby requested for the following: Provision of New Prefabricated Smart Building System that utilizes Hybrid Glass-Fiber Reinforced Thermoplastic Composite Panels or similar material. Based on new requirements to identify viable existing products, specifically composite panel prefab smart building systems, the UN Office of Supply Chain Management seeks solutions that are rapid deployable, have a long lifespan, and improve power demand management. This comprehensive questionnaire is designed to gather detailed information from manufacturers and suppliers regarding the suitability and availability of customizable structures that utilize Hybrid Glass-Fiber Reinforced Thermoplastic Composite panels for UN military operations or similar material. The focus is on sustainability, modular building systems, customization, durability, aesthetics, security, and environmental considerations. Your input will be invaluable in assessing market capabilities and aligning them with the United Nations operational needs for durable, energy-efficient structures suitable for deployment in various global environments. The qualifications of interest for this product are the following: 1. Rapid Deployment: The product is designed for quick erection and commissioning with minimal use of heavy engineering equipment and specialized trades; 2. Modular System: It drastically reduces construction time and labour costs, shipping flat in ISO Standard 20 ft. Sea Containers for efficient logistics; 3. Customization: Features customizable options for size, rigidity, texture, colour, and inserts, adaptable to specific needs, utility, and environmental conditions; 4. Energy Efficiency: Enhances power demand management and provides superior R-value thermal performance, optimized acoustics, and resistance to energy loss; 5. Environmental Considerations: Sustainable, eco-friendly, 100% recyclable, and significantly reduces greenhouse gas emissions and carbon footprint. It is non-toxic and resistant to moulds, bacteria, and chemical corrosion; 6. Durability and Maintenance: Designed for a long lifespan of up to twenty years with minimal preventative maintenance, resistant to moisture, air infiltration, and pests like termites and rodents; 7. Compliance and Certifications: Meets international standards for military use and adheres to regulatory codes and environmental certifications. Country: Global. Please confirm the closing time as it was not published. (EN) add to Favorites
Customer: ONLINE TENDERS

Number: 108661181

Country: South Africa

Source: ONLINE TENDERS

22 jul
Re-Advertisement: Information are hereby requested for the following: Provision of New Prefabricated Smart Building System that utilizes Hybrid Glass-Fiber Reinforced Thermoplastic Composite Panels or similar material. Based on new requirements to identify viable existing products, specifically composite panel prefab smart building systems, the UN Office of Supply Chain Management seeks solutions that are rapid deployable, have a long lifespan, and improve power demand management. This comprehensive questionnaire is designed to gather detailed information from manufacturers and suppliers regarding the suitability and availability of customizable structures that utilize Hybrid Glass-Fiber Reinforced Thermoplastic Composite panels for UN military operations or similar material. The focus is on sustainability, modular building systems, customization, durability, aesthetics, security, and environmental considerations. Your input will be invaluable in assessing market capabilities and aligning them with the United Nations operational needs for durable, energy-efficient structures suitable for deployment in various global environments. The qualifications of interest for this product are the following: 1. Rapid Deployment: The product is designed for quick erection and commissioning with minimal use of heavy engineering equipment and specialized trades; 2. Modular System: It drastically reduces construction time and labour costs, shipping flat in ISO Standard 20 ft. Sea Containers for efficient logistics; 3. Customization: Features customizable options for size, rigidity, texture, colour, and inserts, adaptable to specific needs, utility, and environmental conditions; 4. Energy Efficiency: Enhances power demand management and provides superior R-value thermal performance, optimized acoustics, and resistance to energy loss; 5. Environmental Considerations: Sustainable, eco-friendly, 100% recyclable, and significantly reduces greenhouse gas emissions and carbon footprint. It is non-toxic and resistant to moulds, bacteria, and chemical corrosion; 6. Durability and Maintenance: Designed for a long lifespan of up to twenty years with minimal preventative maintenance, resistant to moisture, air infiltration, and pests like termites and rodents; 7. Compliance and Certifications: Meets international standards for military use and adheres to regulatory codes and environmental certifications. Country: Global. Please confirm the closing time as it was not published. (EN) add to Favorites
Customer: ONLINE TENDERS

Number: 107857019

Country: South Africa

Source: ONLINE TENDERS

17 jun

Number: 106045475

Country: South Africa

Source: RFQ

27 feb
Rand Water Foundation (RWF) invites tenders for the following: Supply, deliver and install the following at Lethabo Site Offices: Scope: Supply all labour, material and equipment to install the Lethabo Pump Station Site Offices as detailed in the scope of work: - Phase 1: Preparation of the ground for placement of the porter camp, - Phase 2: Supply, delivery, and installation of porter Camp as per the drawing, - Phase 3: Supply, deliver and install office and kitchen furniture, - Phase 4: Connection to the site services (Electrical, potable water, and wastewater), - Phase 5: Supply, delivery, and assembling of office and kitchen furniture, - Phase 6: Paved Apron and Brick-up bottom of the porter camp to prevent sheltering of wildlife i.e. snakes, squirrels, and meerkats, - Phase 7: Covered and paved Carports. The porter camp offices and other buildings to be fully constructed with 3 set of keys for all locks and fitted with 2 off 48000 BTU inverter Split unit Air conditioner and accessories listed as part of the items. Supply, deliver and Install Porter Camp Offices: 11m long x 6m Wide with integrated Kitchenette: • Preparation of the ground/platform to position the porter camp, • The office space must have weather insulated painted walls, floor tiles, ceiling, doors and windows with burglar bars, and horizontal aluminum blinds, • Kitchenette to be ±2.5m long standard and ±2.5m width fitted with a wooden countertop, double sink, two drawers and two lower cupboards with shelves, Installation of the required plumbing and drainage system, • Supply, deliver and install 2 x flushing Toilets (Male & Female with labels): sewer system and plumbing to be connected to the existing sewer system. Installation of the toilets to be completed with privacy (frosted) windows and burglar bars. The toilet space must be fitted with 25L geyser, • Supply, deliver and install connection to the site electrical distribution board. Price to include fitting of 3 plug points in the kitchen, 6 plug points in the office space, lights (inside and outside all external doors) and switches, light bulbs, labour issuing of COC as per OHS act and SANS10142-1 and all the other necessary supplies. Plug point positions to be confirmed during execution of the works, • Supply, deliver and install Connection to the site services (portable water and wastewater), • Office building and toilets to be fitted with gutters, Awning over all doors and installation of a 2m paving apron all around. Supply, deliver and Install 4 x IBR roof covered and paved carports. The contractor to provide a fire extinguisher as part of the safety requirements. (EN) add to Favorites
Customer: ONLINE TENDERS

Number: 100354675

Country: South Africa

Source: ONLINE TENDERS

15 feb

Number: 99666257

Country: South Africa

Source: RFQ

25 nov
Addendum: Amendment to the Tender Documents: Bids are hereby invited for the following: Appointment of a multidisciplinary professional team for the construction of a paediatric ward at Kwamagwaza Hospital. Scope of Works of the Construction Project: The construction process takes shape long before that initial excavated scoop of dirt, once an order has been issued, then begins the contractual obligations as stated in the contract agreement. The site is then handed over to the service provider where the site office will be established as required. Throughout the construction process through corroboration between the client, principal agent and contractor, according to the extent of services rendered correctly, interim payments will be issued to the contractor. The following items is the works that will occur once site is established and all team members are orientated: - HAST building renovation and decanting of paediatric ward; - Land surveying for existing services as well as establishing foundation levels; - Bulk excavations for strip foundations and stockpiling excavated materials if legible for reuse. Laying of reinforcing steel according to the bending schedule; - Casting of concrete foundations to the required strength, vibrating the concrete to eliminated air bubbles and curing the concrete; - Substructure brickwork construction with waterproofing and backfilling using excavated materials; - Laying of reinforcing and waterproofing for the concrete floor slab; - Pouring, vibrating and curing concrete floor slab of correct strength; - Superstructure brickwork construction with appropriate gaps for all openings; - Formwork for all beams and columns where required; - Casting beams and columns at correct strength and method; - Installing roofing as specified; - Furnishing all openings as specified; - Excavations and installation of Sewer, Storm water and Portable Water systems; - Electrical and mechanical fittings; - Snags; - Health Technology Systems (furniture, medical equipment, IT hardware and software, linen & crockery and cutlery); - Commissioning of all equipment as required; - Snags & Retention; - Closeout. Required Multidisciplinary Team Composition: - Construction Project Manager (Principal Consultant and Principal Agent); - Structural Engineer/Technologist; - Civil Engineer/Technologist; - Architect; - Quantity Surveyor; - Mechanical Engineer/Technologist; - Electrical Engineer/Technologist; - Construction Health and Safety Agent; - Land Surveyor (to be appointed post award); - Geotechnical Engineer/Technologist (to be appointed post award); - Environmental specialist (to be appointed post award). (EN) add to Favorites
Customer: ONLINE TENDERS

Number: 94967133

Country: South Africa

Source: ONLINE TENDERS