For heating: South Africa tenders, rfq bids, opportunities and procurement 2025


Total: 189
09 dec

Number: 115657388

Country: South Africa

Source: ONLINE TENDERS

24 nov
Erratum: Please note that the closing date, document collection and site inspection details has been amended. Bids are hereby invited for the Appointment of Additional Event Management Service Providers to the Existing Contract Ending 18 October 2026. Scope: Logistical Requirements; • Sound; • Audio-visual screens; • Live streaming and virtual connection services; • Staging as per the technical riders; • Tents/marquees; • Shaded stages/raised platforms; • Lecterns; • Chairs; • Tables; • Water (bottles or sachets); • Public Address System (PA system); • Standby technical assistance; • Power generator(s); • Climate control, eg heating and cooling; • Portable chemical toilets; • Clearing and cleaning of site (before and after); • Signage; • Sufficient number of safe parking; • Exhibition facilities; • Catering; • Site plans/layout; • Crowd control barriers; - It will be required of the events management company to appoint an artistic director for some events; - Catering; - Branding at National and International Events; - Liaison; - Photographer and Videographer at National and International Events; - Interpreters, Interpreting Equipment, Transcription, Translation and Rapporteurs; - Transport and Mobilization; - Tour Operator; - Security; - Invitations, Accreditation, and RSVPs; - Promotional Items; - Décor and Flower Arrangements; - Task Directive: Hypothetical scenario proposal for evaluation and selection purposes. (EN) add to Favorites
Customer: ONLINE TENDERS

Number: 114702470

Country: South Africa

Source: ONLINE TENDERS

08 aug
Quotations are hereby invited from service providers to supply and install fan coil units and split air-conditioning units. Scope of work 1: Supply and install 6 off fan coil units: Supply and installation of 6 off chilled water fan coil units together with independent powered supplied in-line condensate pumps for 4 off the units in the DMTP office areas: 1. Size and location of fan and coils to be replaced: a. SCADA Room, SAAMBR Technical Workshop: - Input Power = 2870W, - Rated Current = 13A, - Cooling/Heating Capacity = 27 000Btu/h, - EER = 9.4 Btu/v h, - Air Volume = 1900 CFM, b. Ori-lab, SAAMBR: - Input (V/Phase/Hz) = 220-240V/1/50, - Rated Current = 66/0.29 (W) (Amp), - Cooling/Heating Capacity = 4.54/15500 KW/Btu/h, - Air Volume = 1070 CFM, c. Lab 50,Office 27, Office 40 and Office 42 - SAAMBR: - 4 x 3.84 KW Fan and Coil Units, d. All Fan and coils units are to be installed with Independent/dedicated powered supplied in-line condensate pumps, e. New Control and isolation Valves are to be installed for all Fan and Coils Units, 2. General scope of works: • De-commission and remove old units, • Disconnect the electrical supply and make safe, • Supply and installation of new fan and coil unit, • Make good on all building work, new piping and insulation, lagging to be done on chilled water pipes. All building work is the responsibility of the contractor, • All areas that work is carried out in, area must be left clean, and all openings are closed, • All work carried out in areas where there is the presence of animals, arrangements must be made before work commences in that specific area, • All work carried out with the least amount of disturbance to the guests, staff and animals, • All condenser coils must be blue-chem treated (Sea shore treatment) for all indoor and outdoor units, • Ensure ceilings boards are cleaned and replaced correctly, • All piping and Cabling to be ducted or installed inside conjugates boxes / piping and cabling should not be visible. Scope of work 2: Supply and install Split Air Conditioning Units: General scope of works: • De-commission and remove old units, remove Armaflex and remove old copper tubing, • Disconnect the electrical supply and make safe, • Supply and installation of new split type air conditioning units using for R410A gas, • Make good on all building work, new piping and insulation. All building work is the responsibility of the contractor, • All areas that work is carried out in, area must be left clean, and all openings are closed, • All work carried out in areas where there is the presence of animals, arrangements must be made before work commences in that specific area, • All work carried out with the least amount of disturbance to the guests, staff and animals, • All piping and Cabling to be ducted or installed inside conjugates boxes / piping and cabling should not be visible, • All condenser coils must be blue-chem treated (Sea shore treatment) for all outdoor units - Blue Chem Certification must be supplied for each unit and each unit to be labeled accordingly, • Where new power supplies are required, it is the responsibility of the service provider to install the cabling, isolator switches and to do all connections to the relevant DB’s, • 3 AC’s require condensate pumps with piping for the pumping out of the condensate. Size and location of split air conditioning units required: 1. 9 000 btu’s, qty: 6, location: - Parking B, - Parking A x 3, - Mitchelle’s office, - Dolphin ticketing – replace window wall with a split aircon, 2. 12 000 btu’s, qty: 11, location: - Quarantine Lab office, - Ticketing (Supervisor’s office), - Ticketing (Server Room), - Ticketing (Wet ‘n Wild), - Water Quality Lab (includes Condensate Pump & Piping), - Clinic (includes Condensate Pump and Piping), - Dolphin Lookout - ticketing, - Procurement Buyers’ office x2, one, replace window wall with a split aircon and cover whole, - Atlas plantroom, - Dolphin technical room, 3. 18 000 btu’s, qty: 5, location: - Dolphins office x 2, - Microbiology Lab (includes Condensate Pump & Piping), - Quarantine Lab, - SAAMBR Technical rest room, 4. 36 000 btu, qty: 1, location: Curatorial Food Prep, 5. 24000 btu, qty: 1, location: Ori Lab office. (EN) add to Favorites
Customer: ONLINE TENDERS

Number: 108825154

Country: South Africa

Source: ONLINE TENDERS