Quotations are hereby invited for the following: Assessment and Issuing of the Certificate of Compliance (COC) for electrical installation at ARC - SG. Work to resume on site within 07 days on receipt of the PSO (purchase order). Required at: ARC Small Grain, 11km on Lindley Road, Blydskapweg, Bethlehem. (Tender №91043549)

Country: South Africa
Language: EN
Number: 91043549
Publication date: 16-09-2023
Source:

Description

Full information on the tender is closed.
For further work with the site read the information below.

About us

Leading searching system of world tenders

  • Largest database of tenders and sources of procurement of the World
  • Free daily mailings according to Your settings
  • Winners information
  • Convenient display and downloading of information

Choose us

Getting Started

After site registration, this functions will be available to You

  • Subscription to free mailing list for your keyword phrases
  • Tenders announcements previews
  • Download summary information in Excel format
  • View information about tender winners, suppliers and customers

REGISTER

For using all functions of our site and view full information you need to register a commercial account

  • Selected period
  • Pay access in any of the possible ways

Get full access

Other tenders for this period

Quotations are hereby invited for the following: Sump pumps. Scope: • 1 x Complete sewer ejector pump with motor; • 1 x Complete sump pump a with motor. Source: ONLINE TENDERS

Bids are hereby invited for the appointment of a contractor for the construction of gabion retaining walls at the Walter Sisulu National Botanical Garden. Scope: • Clear, remove and grub the rubbish, debris, vegetation, hedges, boulders, shrubs, and trees to a maximum width of 5m; • Dismantle the existing damaged gabions wall, stockpile the stones to be re-used and dispose the gabions baskets to the dump site; • Installation of 132 gabion baskets (1 x 1 x 1 m) Class A, galvanised hexagonal mesh units, neatly packed or filled with new gabion rocks at the front rows. Gabion rock sizes range from 100 mm to 250 mm. The project is located at the Walter Sisulu National Botanical Garden, Pretoria, Gauteng. Source: ONLINE TENDERS

Quotations are hereby invited for the following: appointment of a suitably qualified and experienced service provider for the supply and installation of CCTV Cameras at the MUT New Engineering and Student Centre Buildings as per specifications. Business Unit: Infrastructure Department. Please note that this RFQ was published late. Source: ONLINE TENDERS

Information is hereby requested for the following: Body worn and dashboard cameras for the South African Police Service. Source: ONLINE TENDERS

Quotations are hereby invited for the following: Contractors for the issuing of annexure B’s for lifts and escalators on an as and when required basis for a period of 36 months at various PRASA stations and associated properties within an 80 km radius of Durban Station. Scope: This will include, but not limited to, the following: Provide Annexure B - Comprehensive report for Electric Lifts (SANS 1545-1) and Annexure B - Comprehensive report for Escalators and Passenger conveyors (SANS 1543) per the attached BOQ by a registered lift inspector. Source: ONLINE TENDERS

Quotations are hereby invited for the following: Design and implementation of Wi-Fi network at Petroleum Agency SA. Scope of work: 1. The proposed solution should include a controller-based architecture to centrally manage and control the Wi-Fi network; 2. The access points should be designed for ceiling-mounted installation to ensure optimal coverage and performance throughout the premises; 3. The solution should provide seamless coverage across our entire facility, including offices, and meeting or boardrooms; 4. The proposed solution should be scalable to accommodate our growing needs; 5. The solution should incorporate a web filtering solution to enforce internet usage policies and provide content filtering capabilities; 6. The Wi-Fi solution must support the latest IEEE 802.11 standards, such as Wi-Fi 6 and 6E (802.11ax), ensuring high data transfer rates and low latency; 7. The solution should include robust security features, such as WPA3-Enterprise encryption, rogue access point detection, and intrusion prevention mechanisms; 8. The Wi-Fi network must be totally separate from the corporate network, with its own Internet access line that is at least 50 Mbps. It will only have the guest SSID; 9. Since the Wi-Fi network needs to be separate from the corporate network, dedicated device/s must be provided with sufficient number of PoE ports to cater for the proposed number of Access Points (APs). If there is a requirement for additional network points, PASA will be responsible for the cabling; 10. The proposed solution should include a minimum three-year warranty on all hardware components, including access points and controllers; 11. The Service provider must provide ongoing technical support during and at least 30 days after the implementation phase, including troubleshooting and issue resolution; 12. Provide training to relevant PASA staff so that they can manage the Wi-fi network. Source: ONLINE TENDERS