Cutting, jointing and laying 8 inch dia G.I. Pipeline required for diversion of the existing dilevery side pipeline of the 2000 G.P.M. Pump Motor Set involved in supplying water to the Village Pond, owing to development of the O.B. Dump, w.r.t. Karo (Tender №95182266)